Welcome to the Electrical and Mechanical Design Department of Borjsazan Parsian

The design of the installation plan (electrical and mechanical) is carried out by experienced and specialized people at BorjSazan Parsian Company. In relation to the mechanical installation plan, the design of the building’s heating and cooling system is considered. So that it results in the least energy loss. The design of the electrical installation plan is actually the technical design of the building, in which the necessary wiring is carried out to provide the required lighting and electricity.

An electrical and mechanical drawing is a technical drawing that includes more information than the Phase 1 drawing for a construction or industrial project. In fact, the Phase 2 drawing includes more details of materials, equipment, electrical and mechanical systems, and their installation and commissioning. Generally, electrical and mechanical drawing is important for employers and builders because it helps them to be aware of the details of the project and to be able to make the best decisions about equipment and materials.

Facilities design standards (electrical and mechanical) are the number one priority of Parsian Company.

Designing a facility map (electrical and mechanical) includes several items and standards, some of which we will mention here:

  • Identifying the direction of north and Qibla on the map
  • The exact location of the building on the municipal map, the location of streets, sidewalks, parking lots, etc. around the building.
  • Coordination and consistency between the architectural plan of the building and the designed facility plan
  • Accurate calculation of building distances, measurement of land characteristics and dimensions of skylights according to the municipal map
  • Paying attention to green space and considering its details in designing electrical and mechanical installation plans
  • Characteristics of different floors in multi-story buildings, such as the location of doors and windows
  • Specifications of false ceilings, including the type of false ceiling, materials used, and height from the floor of the rooms
  • Clear plans for different rooms and their types of use, in order to install specific equipment such as utility equipment.
  • Detailed specifications of the stairs, including the number of steps, their location, and the direction of the stairs
  • Detailed map of the building’s roof and surface heights
  • Specifications of the building structure, mechanical installations such as ventilation and air conditioners, and electrical installations such as antenna locations on the roof plan
  • Specifications and direction of gutters and water paths
  • Map numbering with accurate dimensions and details
  • Building facade plan specifications

Designing the installation plan (electrical and mechanical) is very important because any error in calculations and execution can cause irreparable damage. It is important that this work is done by a specialist. For example, if the wiring is not done by professionals, it may result in accidents such as electric shock and subsequent fire. All standards must be observed in the design of these plans.

As you know, an important part of the construction process is electrical and mechanical installations, the design and construction stages of which are carried out by mechanical engineers and electrical engineers. The design of the installations is divided into two parts:

Part One: Electrical Installation Design

Part Two: Mechanical Design (Mechanical)

What is the role of electrical engineers?

The duties of a building electrical engineer are divided into five parts from the beginning of the project:

  1. Studying architectural plans in two parts: 1- Understanding the building 2- Using the spaces
  2. Meeting with the project architect and the client
  3. Obtaining necessary information from the project architect
  4. Implementing required electrical spaces in facility plans

What parts does the building’s electrical installation include?

These facilities are mostly related to the building’s wiring section, and the items listed below are considered part of these facilities.

  • Brightness
  • Electricity
  • Building intelligence
  • Telephone
  • Central antenna
  • Fire alarm system
  • Implementing a computer network
  • Emergency power supply
  • Elevator
  • Escalator
  • CCTV camera

Parsian Company’s electrical design engineers and mechanical design engineers, working together and using the information they receive from the project architect, are responsible for designing building facility plans and deliver their tasks to the project architect and contractor in the shortest possible time and with the best quality.

What is the mission of the Parsian Mechanical Engineers team?

In relation to the mechanical installation plan, the design of the building’s heating and cooling system is considered. So that it results in the least energy loss. Mechanical engineers research, design, develop, manufacture and test mechanical and thermal devices, including tools, engines and machines.

Like other engineers, mechanical engineers on the Parsian team use computers to help create and analyze designs, run simulations, and test how a machine works. Our engineers must be licensed by a state, provincial, or national government. The goal of this process is to ensure that engineers have the necessary technical knowledge, real-world experience, and knowledge of the local legal system to practice engineering at a professional level.

Works with AZEXO page builder